Very little was done in the garden over the winter, though three more open wagons (see How I made the second batch of wagons) and a locomotive kit (see How I made the Peckett Locomotive) were constructed during the Christmas break. They were finished off during the Easter holidays. This brings the complement of goods stock to 4 open wagons, 2 vans (1 LGB, 1 Accucraft), 1 flat wagon (LGB) and a guard's van.
I also purchased another Bachmann bogie coach so I now have a matching pair, together with a Bachman baggage car. The intention is to convert these (one day) into coaches which more closely resemble British counterparts - such the the Pickering coaches of the Welshpool and Llanfair or maybe the balconied stock from the Cavan & Leitrim. But for now, imagination will suffice!
[Update February 2015 - these coaches (plus one more) were eventually bashed into a rake of coaches resembling those which ran on the Leek & Manifold Railway - see How I bashed some Bachmann Jackson Sharp coaches into Leek & Manifold coaches]During the Easter vacation, a couple of days were spent re-taming the garden, cutting back the more vigorous plants and trimming back some of the undergrowth. I also took the opportunity to shape a couple of the lonicera bushes into more realistic tree-like shapes.
The tracks were cleaned and an operating session was held, to check the new stock and to see if anything had become damaged or dislodged over the winter. A couple more heathers, a dwarf conifer and a dwarf peris were planted.
The stream sump was cleaned out and refilled with fresh water. I disturbed a young frog who has taken up residence. No idea where they come from as, to my knowledge, there are no gardens nearby with ponds - but each year I find frogs and toads in the garden.
I've begun to realise that I need more storage. I already have more stock than space so at some point I will have to construct some shelving above the sidings to hold the spare stock.
<< Go to Progress Report 10