Sunday, October 27, 2019

Progress Report 77

It's been a while since I posted an update on progress with the railway. The weather has been very mixed in this part of the UK since April and so I have had few opportunities to get out into the garden for sustained operating sessions. However, I have finished off a few jobs and experimented with various control systems.

Lineside

Coal yard at Beeston Castle

As part of the general titivation at Beeston Castle, having finished the castle ruins (see How I constructed Beeston Castle from Thermalite blocks), added a brewery (see How I constructed the brewery ) and added a new siding (see Progress Report 74), I decided to detail the yard beside the new siding by adding some coaling facilities - including staithes/bins and a coal office - see How I detailed the coal siding at Beeston Castle.

In addition, I constructed a set of coal scales to add a little more detail (see How I constructed some coal scales).

Sand quarry

To provide a reason for running a rake of sand hopper wagons recently constructed (see How I constructed a rake of Snailbeach(ish) sand hopper wagons),

I added a new siding on the outskirts of Bickerton Station (see Progress Report 75) and then constructed some loading hoppers from foamboard (see How I constructed loading hoppers for the sand quarry).


In addition, I cast a loading embankment from concrete for a 32mm narrower gauge feeder line to fill the hoppers (see How I cast a concrete embankment).

Figures

A few more figures were acquired from a trip to the Llanfair Caereinion Garden Railway Show. Some (ModelTown) were bought unpainted and so will pass through the paintshop at some point in the near future, ......
........ while a few others were rescued from a couple of bits boxes on traders' stands. It's pleasing to find that it is still possible to grab a bargain at Shows and Fairs if I am diligent enough.

In addition, some sheep figures were bought from Trenarren Models ......

 and a few more 3D printed sheep from Design Scan Print.

Stock

Snailbeach sand hoppers

The most significant addition to the fleet is a rake of nine wooden hopper wagons based loosely on those which ran on the Snailbeach and District Railways.

These were constructed from plasticard on modified HLW (Hartland Loco Works) mini series wagon chassis (see How I constructed a rake of Snailbeach hopper wagons).

Tralee & Dingle cattle wagon

Another bargain find at the Llanfair Show was an ex-Tralee and Dingle cattle wagon which appears to have been carefully scratchbuilt in wood. The stall-holder suggested it was a 10mm scale model but, putting it alongside my other cattle wagons, it looks about right for 16mm scale. It was 32mm gauge but it was relatively easy to prise off the solebars, drill out the bushes and re-wheel it with Bachmann metal wheels.

I will give her a repaint and load her with sheep (see above).

Freelance diesel bash

After using an off-the-shelf LGB ToyTrain diesel loco to test out various combinations of Arduino-based radio control systems (see below).....

.... I decided to rebuild the loco to make her more in keeping with my 1930s era rolling stock. Rather than a complete rebuild, I decided to keep the main body components more or less intact as these conveniently clip together, thereby making access to the electronic control systems straightforward. I intend to keep experimenting with Arduino based control systems and so keeping this loco for testing purposes seems sensible.

I feel that the heavily riveted bodywork and somewhat chunky appearance gives her a utilitarian post WW1 feel (see How I modified an LGB ToyTrain diesel loco).

Brake gear

I have slowly been adding manual brake gear to my wagons. I have tried various approaches, using plasticard, brass strip and even stripwood, but feel that the most durable and realistic looking gear comes from using brass strip, particularly as I have made a simple wooden jig to hold the pieces in alignment when soldering.

For more information see How I made brake gear for my wagons

Permanent Way

Reballasting

After watching some recent videos of the railway in action (for example)......

  ...... I realised that there were some sections of track which were in urgent need of reballasting. My tried and trusted method of using horticultural potting grit cement was used once more to provide what I consider to be the right balance between realism and convenience. I apply it as a dry mix and then use a fine rose on the watering can to fix it into place. After it has weathered naturally, I am very pleased with the results.



Operation

Arduino experiments

As indicated above, I have been experimenting with variations on control systems based around Arduino Nano programmable components. I was intrigued with the idea of using a mobile phone to control my locos using Bluetooth and also the efficacy of trying 2.4gHz radio control.

Bluetooth control

I tried three approaches to Bluetooth control - using free or very cost effective apps for my Android phone - iPhone versions are also available.

Ultimately, I arrived at a system which combined Bluetooth phone app control with MP3 digitised sounds.

I was pleased with the outcome in terms of its cost effectiveness and the level of control which could be achieved. However, I struggled to use the phone apps successfully. Maybe the display on my cheap phone isn't sufficiently clear, but I was unable to see the controls clearly when the sun shone, and also having to keep looking at the screen to operate the buttons and sliders was for me a distraction. I much prefer the tactile feedback of a handheld controller with physical knobs and buttons.

See:

2.4gHz radio control

I felt I had progressed as far as I wanted with Bluetooth phone app control and so wanted to explore the potential of using 2.4gHz radio control modules with Arduino. After some experimentation and a bit of trial and improvement, I ended up with a basic 2.4gHz handheld transmitter and receiver system, which also utilised the same MP3 sound system which I had developed with the Bluetooth system.

I am quite pleased with the outcome. Whilst the system is not quite as precise as my Deltang based systems, particularly in terms of slow running, there is considerable potential in the Arduino system which, as yet, I have not tapped. I intend to conduct a few more experiments and will share my experiences once I feel I have got to grips with the system.

Psion Freight Manager program

For many years I have been using a PC based management system to generate freight movements on the railway (see My computerised freight management system). This has served me well, but one of the disadvantages is that it relies on using hard-copy print-outs of the manifests. This is not too onerous but does lack flexibility. I can't modify the movements on the fly should complications arise.

While clearing out the cupboard under the stairs - which had become a dumping-ground for all sorts of redundant household items - I discovered my old and faithful Psion pocket computer. When it was developed, the technology was quite advanced and I remember using it constantly for time management, calculations and note taking (I even wrote several chapters of a book using it) in the days before the advent of smart phones. For me, one of its greatest assets was its inbuilt programming language. Dusting off my programming skills, I created a version of my freight management program to run on the Psion.

I have used it a couple of times now and have found the ability to make adjustments to the schedule very handy - if for example, I forget to drop off a wagon I can now transfer the movement to a later train. For more information see My Psion based freight management system.

One day, I might try transferring the system to my mobile phone - but that would require me learning how to create phone apps - a bridge I have so far not crossed.

Operating sessions

I have managed only one full operating session this season. This doesn't mean I haven't run any trains in the meantime. It just means I have only had one full session where I run a complete day's timetable with computer generated freight movements. This has largely been due to a lack of reliable weather - I need at least two consecutive days of decent weather to run a full session - and also because of other things competing for my time.

One of my non-full sessions featured a day out for one of my hypothetical characters - Jeanne Brunell who was actually the French lady's maid to Lady Tollemache in the 1910s (as recorded in the 1911 census for the area).

The video gave me an opportunity to take some onboard footage through the carriage windows - something I've not trued previously.

General

More magazine articles

I've had a few articles published in Garden Rail recently which seem to have been well received.



I quite like the added discipline of composing a magazine article and, of course, the buzz of seeing my scribblings in hard copy. The extra pocket money comes in handy as well.

New workshop

The most time consuming project recently has been the construction of a new workshop and garden shed. Previously, the railway wound its way behind my old garden shed and a lean-to shelter I had constructed for our old trailer tent. Having sold the trailer tent, I dismantled its shelter and at the same time removed the shed which was beginning to show its twenty-year age. This left a reasonably sized plot in the corner of the garden.

After scribbling a few ideas for a shed/workshop I purchased a few bits of wood, some boards, a couple of secondhand doors, a secondhand window and some roofing felt and set to work.

I am presently fitting-out the interior and, in time, I will be able to transfer my workbench and equipment from their present location in the conservatory which, as a consequence of my annexation, has not been able to function as a proper conservatory for quite a few years! Once completed, I will share my experiences on here (see How I constructed my workshop - pending)




Monday, December 24, 2012

Progress Report 44

At this time of year I tend to find that railway maintenance and development goes into tick-over. Rather than becoming immersed in a grand project, I am more inclined to tinker with several ongoing tasks. The major project on hand at the moment is the construction of buildings for the copper mine which are taking up quite a bit of space in the conservatory which I also use as a workshop. The sheer size of these structures means that each job takes some considerable time. There is also a fair degree of waiting between jobs as glue, paint or filler dries and/or hardens. During these interludes, I usually turn to other jobs - some of which I regret to say have to be non railway-related. Since the last progress report I have, however, engaged in a few other activities - constructing a wooden loading hopper from a kit, sculpting some figures in oven-hardening polymer clay and purchasing a kit for a battery-powered diesel outline loco.

Mine buildings - update

Since the last progress report I have grouted and started painting the stonework to more closely resemble the local sandstone. I experimented with various sorts of grouting and eventually opted for a mix of cream and brown tinted waterproof grout which was left over from a couple of household tiling jobs. The grouting not only fills the gaps between the blocks, it also gives them a bit more texture.

The corrugated iron sheets have been given a couple of coats of red 'oxide' primer and a start has been made on weathering them using acrylic paints and Scenic Rust which I used successfully to weather the tippler wagons (see How I weathered some LGB tippler wagons).

Originally, I cut down some 32mm gauge SM32 track to 16.5mm gauge for the minimum gauge feeder line, but this looked over scale. I have since bought some Peco 0-16.5 'crazy' track and although this is under scale, it more closely resembles the sort of lightweight rail which would have been used for a minimum gauge mine railway.

One day I aim to build and indoor Gn15 railway to maybe represent the imagined estate railway which my hypothetical history suggests would have been constructed at Peckforton Castle by Lord Tollemache, after having been inspired by his near neighbour's line at Eaton Hall (see A short history of the railway). As you can see, I have accumulated a few items of rolling stock over the past few years. My visits to various minimum gauge railways across the UK has made me become a lot more aware their history and the influence of Sir Arthur Heywood and Henry Greenly (eg see The Perrygrove Railway).

Loading hopper

A chance find on eBay led to the purchase of a prefabricated German wooden kit for a loading hopper. I had always intended to construct a set of wood and steel loading hoppers for the copper mine and this kit has somewhat short-cut the process.

The hopper will eventually be located over the track leading from the copper mine to the exchange siding at Beeston Market (see How I constructed buildings for the Copper Mine) but as this will require some widening of the timber trackbase the hopper was temporarily sited on the timber yard siding at Peckforton for the photo shoot.

There is still some detailing and light weathering to be completed on the model but for now I am pleased with the outcome (see How I constructed a loading hopper)

Bespoke figures

I have been trying for some time to find appropriate figures in various poses to make a few small tableaux on my railway without success. I have found with commerical figures that either the poses are not what I want or the clothing is not appropriate for an English narrow gauge railway set in the early 1930s. After an abortive attempt to construct my own figures from polymer clay (see Creating atmosphere - Progress Report 31), I consulted various sources on the internet and have been improving my skills. I certainly can't claim to be a Rodin, a Henry Moore or an Antony Gormley but my figures are slowly beginning to resemble something vaguely human.

[Awaiting photo]

The knack seems to be getting the proportions right in the early stages and then having considerable patience and time to sculpt features and details. I have found this is the sort of job I can do while 'watching' TV in the warmth of the living room on these cold and dark winter evenings.
Once I have perfected my techniques to what I consider to be a reasonable standard, I will share my results via another posting. However, this might be some time in the future, given my slow rate of progress so far.

Diesel loco kit

Another chance purchase through the G Scale Central forum resulted in the arrival of a 'Jessie' diesel locomotive kit made by IP Engineering.
Source: http://img36.imageshack.us/img36/6893/bt7wmmkkgrhgoheyejllly8.jpg
As this kit is no longer listed on the IP Engineering website I assume it is discontinued. However, the kit I purchased seems to be complete and also includes various additional detailing parts. Once completed this loco will be added to the slowly growing roster of battery-powered locos which I am accumulating (eg see How I constructed a railmotor). My ultimate plan is to have a complete set of locos for both DCC and battery power to hopefully extend the opportunities for operating sessions through the year as the track cleaning process required for track power can become tedious prior to a brief operating session (see How I clean the track).

Tuesday, December 18, 2012

How I constructed a loading hopper

The copper mine is an important feature of the railway as it was the supposed reason for the line's existence. I recently started construction of some low-relief mine buildings (See How I constructed some low relief buildings for the copper mine) and had planned to scratchbuild a loading hopper, but I happened to come across a wooden kit by the German company of Holzmodellbausatz  on a well known internet auction site.


The kit contained all the pieces needed, most of them pre-cut, and an exploded diagram with some instructions in German.

Although the exploded diagram was well detailed, my lack of ability to read German meant I had no indication as to the order in which the pieces should be assembled. I decided that as the hopper looked to be the most substantial part of the model, I would start with that. The four pieces of ply were glued with exterior PVA and tacked together with copper panel pins.

The four pieces forming the upper part of the hopper were then assembled and glued to the lower section.

Next, the internal sloping pieces for the hopper were glued into place.

The main structure of the hopper was completed and so this was left overnight for the glue to harden. The next most obvious components to be tackled seemed to be the legs. These comprised four pieces of 8mm square stripwood, 336mm in length. There were tacked and glued to the sides of the hopper.

To these were glued the platforms on either side of the hopper, with lengths of stripwood glued and tacked on to keep them aligned with each other.

The side platforms were grooved to allow a door to slide beneath the hopper to control the flow of rocks etc.. I decided not to construct this as operational as the fairly basic mechanism looked to be more functional than realistic.

The struts for the legs were then glued into place - two per leg.

Although I have a fair amount of confidence in PVA as a wood glue, I was not too sure about the bond between the struts and the legs and the rest of the structure. Short pegs from cocktail sticks were inserted into suitably drilled holes ........

....... before the supports for the legs and struts were glued into place on the foundation blocks.
 Pegs were also used to keep some of the other timbers aligned and in place. These were trimmed and sanded smooth once the glue had set.

The main framework members around the hopper were then glued into place. Initially I concentrated on the more substantial 8mm square members.

The 8mm x 8mm cross members for the legs were then pegged and glued into place.

 I then focused on the 3mm x 8mm framework sections, which needed to be trimmed to size. I decided not to follow the exploded diagram and so placed the timbers where I thought they looked most at home. I also took the opportunity to use them to disguise the join between the sides and the ends of the hopper.

 The main structure for the hopper was now complete.

At this point I decided to treat the wood, using a spirit-based wood preservative (Cuprinol). The stripwood was clearly pine and I had no idea as to whether the plywood was exterior grade and so I decided to take no chances. I flooded the exposed woodwork with two generous coats of preservative and then touched-up any areas which had not absorbed the preservative (ie those already covered with PVA glue) with a muddy mix of  acryclic paint.

Whilst this was drying off, I cut the pieces needed for railings. In the kit, these were supposed to be made from various pieces of stripwood, but to my mind they looked too heavyweight. I decided solder together some metal railings from pieces of brass rod and 00 code 100 nickel silver rail. Firstly, four 6cm long pieces of 00 rail were cut and drilled to take the bars of the railings.

These were then slotted into place in suitably drilled holes and 1.2mm diameter brass rods were threaded through the holes and soldered into place.

The railings were then removed and given a couple of coats of grey primer and a coat of matt black paint.

The railings were then fixed back in place with some epoxy resin to hold the uprights firmly in the holes. A ladder left over from my construction of semaphore signals (see How I constructed semaphore signals) was then cut to length. The legs of the safety hoop were inserted into suitably drilled holes in the side of the platform .........

.............. and a piece of stripwood was fixed to the base of one leg, to which the ladder was attached with a couple of loops fashioned from brass rod.

At this point I decided the main structure for the hopper was complete - though in the future I intend to construct a representation of some sort of operating mechanism for the doors.

I tried siting the hopper in its intended location at the copper mine but some additional foundation work will be needed to widen the raised timber trackbed on which it sits. In the meantime I temporarily positioned the hopper on the timber siding at Peckforton Station for a quick photoshoot.



I am considering weathering the hopper - blanching the timbers slightly and depositing layers of rock dust in the nooks and crannies. However, I am postponing this until I finish the mine buildings, which are presently under construction (see Progress Report 43). Ultimately, the hopper will be connected to the mine buildings via some sort of conveyor to supposedly take the copper ore from the base of the crusher up to the hopper (see How I constructed some mine buildings). The actual design of this will be dependent on the relative positions of the hopper and the building housing the crusher.