Tuesday, July 21, 2009

Progress Report 22 - Platform & Goods stock

Peckforton platform
I finally got around to giving Peckforton station a platform. Owing to limited space, I decided to put the platform on the inside of the curve. This meant I could experiment with a different approach to forming a curved platform. This time, I used concrete platform edging formed using a JigStones mould.

I have only one platform edging mould and hence I had to produce the 19 sections over a period of three days (see How I made structures using JigStones [to come]). Fortunately, rapid-set cement takes only 20 minutes or so to set sufficiently well for the sections to be removed from the moulds so the turn-round time is quite quick.

The first job was to prepare the intended location for the edging blocks. These were bedded on a layer of cement, and then the space behind was back-filled with more cement with wooden shuttering to contain the cement on the back edge of the platform.

The platform surface was initially smoothed down with a trowel. However, I then decided to roughen up the surface with a paintbrush using a mix of brushing and stippling.

There are a few anomalies - as I progressed I realised I needed to use the running surface of the rail as a datum when settling the edging blocks in place and I needed to clean out wet cement from the mortar lines on the mouldings.

However, overall I am pleased with this approach to creating curved platforms. It is relatively straightforward and provides a pleasing result.

Goods stock update
Four wagons have been modified to become more appropriate for the railway.

Tank wagon
A standard LGB tank wagon has been modified, using an anglicising kit from Garden Railway Services (see How I Anglicised a tank wagon)

Guard's van 1 The kit-built guard's van (I think it's an IP Engineering model) which I bought on eBay (see Progress Report 19) has been given a repaint and had a few extra details added. Plasti-kote grey primer is used as standard for all goods stock (it's a lighter shade than Halfords) with the underframe and handles picked out in black. Footboards removed from an LGB closed van (see below) were added and LGB couplings have been installed (which seems like a travesty - one day I will pluck up the courage to change over to centre buffers on all my stock).

Guard's van 2
A half completed GRS conversion bought as part of a job-lot from eBay has been finished off. The basis for the conversion is the ubiquitous LGB closed van which includes a balcony at one end. The previous owner had decided to add another balcony and use plastic mouldings from GRS for the duckets. The conversion was missing one end to the cabin. The door-end of another LGB van (see below) was removed and added to fill the gap, a missing ducket from GRS was fixed in place and roof modified to fit. Various gaps were filled and smoothed down and the whole thing was given a coat of Plasti-kote primer (after masking out the underframe and windows). Various features were picked out in black acrylic.


Closed van
The 'donor' LGB van pillaged for parts for the above two conversions was given a new plain end made from plasticard to replace what was the balcony. The curious side windows were filled in with plasticard and filler which was then smoothed down and scribed. The body was then grey Plasti-koted with details picked out in black acrylic.

Monday, June 29, 2009

Progress Report 21 - Platforms and ballasting again

Sunday was a day of unbroken sunshine and so unfinished 'work' work was put to one side and a full 14 hours was spent on doing a few of those railway jobs which have been on the to do list for more than a while.

Platforms for Beeston Castle

First of all the platform sections were cast for Beeston Castle station. As this is a curved island platform it had to be prefabricated, using the same method described in 'How I made the platforms'.


The moulds were made from 1/2" chipboard for the bases and 1/8" ply for the sides. These were liberally greased before the cement was poured in both the protect the wood and to prevent the cement from adhering to it.

Using the technique learned from Bickerton station platforms, the platform edges were masked with off-cuts of wood and sand was sprinkled into the centre. When the cement was partially set (ie 'green'), the masking strips were removed and the exposed edges were scribed with the end of a trowel to represent stone edging blocks.
These will now be left for a week for the cement to harden off, then they will be removed from the moulds, tidied up and cemented into position.

Here's the platform in situ (just after clipping the hedges). All that needs to be done next is ballast the track.


Ballasting the extension

The extension to Beeston Market and the Copper Mine was ballasted using a combination of the techniques described in 'How I ballasted the track'.

This time, once the dry mix of sand, gravel and cement had been brushed into place:

... and the whole lot dowsed in water from a watering can (with rose attached). Liberal amounts of watered-down PVA adhesive were dribbled on in an attempt to bond the mix together and help it stick to the underlying roofing felt.

After this, the sides of the rails were cleaned up with a screwdriver, to removed gunge from the running surfaces, and a damp cloth was wiped over the surface of the rails to remove as much PVA as possible.

So now Beeston Market station:

the Copper Mine sidings:

and Peckforton station:

have all been ballasted.

Only Beeston Castle station remains unballasted. This will be done once the platforms have been fixed into place.

Wednesday, June 24, 2009

How I made a wooden platform

The station at Beeston Market is mounted on timber supported around three feet from the ground. It seemed sensible to make the platform from wood rather than concrete as in the case of the other platforms. However, I found when positioning a plank in the location as a temporary measure that underneath it attracted the damp (and an accumulation of woodlice, centipedes and the odd slug). I needed some way to protect the wooden platform - even though it is treated timber I could see the rot setting in pretty quickly! I considered wrapping it entirely in roofing felt, but that would be difficult to fix down realistically. I therefore decided to embed it in the existing layer of felt.

The first job was to make an incision in the felt roughly along the centre line of the platform, The felt was folded up and the platform plank was eased into the gap.

Next, the edges of felt were trimmed to a uniform width.

The edging strip was snipped at intervals to represent paving slabs. And more felt was cut to fill the gap in the centre of the platform.

The whole lot was then stuck down with bitumen-based felt adhesive and weighted down with a series of concrete blocks and rocks and left for a week.

When the weights were removed, Evostick was used to fix the odd few bits of edging strip which had not stuck.
It needs a little tidying-up and detailing, but the foundations have been laid.

Tuesday, April 10, 2007

Progress Report 9 - Catching up

A few days' leave at Easter provided an opportunity to complete some outstanding jobs and and run some trains (I now have more than one!).

Platforms
The platforms for both stations were cast in concrete (see 'How I made the Platforms')


Additions to the stock
A chance enquiry when visiting Bay Models resulted in the purchase of a refurbished LGB Zillertal 0-6-2 loco (22711) which means my loco roster has now reached its maximum for the intended timetable (a passenger train, a mixed train and a goods train).

 
[Update November 2017]  Ten years ago, three locos seemed like a reasonable maximum - I now have fifteen locos - and plan to make at least another two ....... strange how ambitions change!

More plants
A few more plants have been added:
  • three more dwarf conifers
  • a hebe
  • a couple of heathers
  • some alpines
  • yet another lavender (I keep losing these)

Some ballasting
Some of the cement-based ballast (See Ballasting the track) had been laid during a heatwave and as a consequence it had dried out too quickly. An opportunity was taken to relay some of this using a stronger mix (2 parts sand + 2 parts gravel + 1 part cement).


Cleaning out the stream
The first time the stream was run it quickly ran short of water. When cleaning the pump filter, I noticed that the soil beside the sump was getting waterlogged. It seems I had cut the pond liner used for the stream too short and hence some water was not finding its way back into the sump. It's surprising how quickly a tiny trickle of water seeping from the system lowers the water supply! A strategically-placed piece of plastic cut from a water bottle now steers the water where it needs to go - it is conveniently hidden under the lip of the slab which acts as a spillway into the sump.

<< Go to Progress Report 8


Sunday, April 08, 2007

How did I make the platforms?

The platforms were cast from concrete to precisely fit their locations. After considering a range of options (wood, plastic, tiles), I decided concrete would be the most appropriate - it is durable, cheap and easy to construct.

Two methods were used:
  • for the terminus, the platforms were cast in situ using shuttering. The platforms here are primarily straight so simple shuttering was feasible.
  • for the through station, the platforms were prefabricated using moulds. The platform here is curved throughout its length and hence shuttering would have been tricky.


Method 1 - shuttering
The platform height was set at 3 cm. This was decided by measuring from the trackbed to the lowest step on one of the coaches.

Stage 1
Strips of 3/4" (2 cm) pine were cut to 3 cm sufficient to form the shuttering for one of the platforms. The width of 3/4" provided the right amount of clearance between the coach steps and the platform edge.

Stage 2
The pine shuttering was positioned around the edges of the area to be made into the platform. To accommodate the curves, the shuttering was cut into shorted lengths (approx 15 cm). The shuttering butted up to the sleepers (ties).

Stage 3
A strong mix of concrete was prepared (see mixing the concrete below) - using 2 parts sand, 2 parts fine gravel (Alpine grit) and 1 part cement.

Stage 4
The concrete was carefully troweled into the shuttering and gently tamped down to ensure there were no air bubbles. The surface was smoothed over with a trowel.

Stage 5
The edges of the platform were masked to a width of around 1.5 cm with offcuts of plywood. Sand was then sprinkled on to the centre part of the platform using a sieve ('borrowed' from the kitchen) to add texture similar to tarmac.

Stage 6
When the concrete had hardened to its 'green' state (ie not fully set) the ply masks and shuttering were removed and the concrete was scribed with the blade of a screwdriver to represent stone slabs. The platform was left to dry (covered at night as there was a risk of a frost).


Method 2 - Prefabrication

I initially considered setting up some sort of shuttering in situ, but rejected this as the platforms were curved along their whole length on both sides and I could see no way of reliably fixing it in place - so I opted for prefabrication.

Stage 1A newpaper template was cut to fit between the tracks.

Stage 2
A felt tip pen was attached to a coach (requiring the widest clearance) which was then run along the tracks to mark the optimum position for the platform. As an extra check, other stock was run along the track to see if there was likely to be any snags.

Stage 3
The paper template was transferred to sheets of 1/2" laminated chipboard and pine (recycled from some redundant shelving). This was then cut to shape with a jigsaw. The sections were placed between the tracks to check clearances (by running various bits of rolling stock alongside).


The height of the platform was determined by measuring from the trackbed to the lowest step on one of the coaches (3 cm). Strips of 1/8" ply were cut to 4.5 cm to take account of the platform height and the thickness of the chipboard. These strips were then screwed to the sides of the chipboard templates to form the moulds.

Rather than creating a single mould, the platform was divided into sections - to make the casting process easier, to allow for some adjustment when fitting, and also to allow for expansion and contraction when the platform is completed.


Stage 4
The insides of the moulds were greased (with standard motor grease) to prevent the cement from sticking. Before the cement was poured into the moulds, miniature stone slabs (obtainable from Miniature Brick Bargains - http://www.stores.ebay.co.uk/miniaturebrickbargains) were pressed into the grease along the sides of the mould to act as facings.

A strong mix of concrete was made (2 parts sand + 2 parts fine gravel + 1 part cement - see below) and poured into the moulds. When the concrete was partially set, stone slabs were pressed into it along each platform edge and sand was sprinked on using a fine sieve to represent the gravelly surface of the platform.

Note: The block in the left hand section is to give clearance for a point motor.

Stage 5
When the concrete had set (after about three days) each section was removed from its mould. Owing to the fragility of the concrete, the sides of the moulds were unscrewed rather than attempting to prise or shake them out. The sections were then loosely positioned to check for clearances by running stock along the tracks. They were scrubbed to remove all traces of grease and then the sections were cemented into place and left to set.


How I mixed the concrete
I do not profess to be an expert, but the technique I use for mixing concrete was taught to me by my dad - who seemed to know how to do most practical things. Anyway, it works ..............

Stage 1
Two shovels of sand and two shovels of gravel (Alpine grit) were put on to an old sheet of plywood I've used for many years for mixing concrete.
Stage 2
A shovel full of cement was added.
Stage 3
The ingredients were mixed thoroughly with the shovel.
Stage 4
A depression was made in the middle of the mix and water added. It's important not to add too much water initially as it can wash the cement powder away.
Stage 5
The ingredients were mixed again, adding water until it reached the consistency of thick cream or custard.




[Update April 2009] After two years, the platforms have fared well.

This photo (above) shows the main terminus platform which was cast in situ. No cracks, but a bit slab-like.

By contrast, the bay platform looks quite good. While the cement was wet, I covered the edges with some strips of wood and sprinkled dry sand over the centre of the platform. When the cement had gone 'green' (ie had not fully set) I removed the shuttering and the strips of wood and scribed blocks along the edges with a screwdriver. Once the cement was fully set I brushed off the loose sand and, as you can see, the result is quite realistic - particularly as little pieces of moss are beginning to populate the cracks.

The pre-cast platforms have also survived well. I had wondered if the small tone slabs would become dislodged, but as you can see they are still very much in evidence. A few did become dislodged immediately after the casting process, but none since.