Wednesday, July 22, 2009

Progress Report 23 - Then and now

I was browsing through some of my old pictures of the garden from 2004-5 before and while the railway was first being built and thought it might be interesting to see how things have developed.
(NB - Click on the images to enlarge them)

What follows is a series of shots taken in 2004/5 and now, for comparison.

A view of the back of the house.
The lean-to is now in place and the railway has taken over this corner of the garden.





The small terraced area of lawn was levelled leaving a much smaller raised bed area in the corner of the garden





and the ramshackle arrangements of sheds was replaced with a new shed and trailer tent store, discretely hidden behind a hedge of leylandii.





This next series of three photos show a panorama taken from the top corner of the garden (beside what is now Beeston Castle station).
This first shot shows how the landscaping has altered the previously boring expanse of lawn.


Swinging to the left, we see the raised bed (holding the stream) which separates the house and path from the rest of the garden.





And finally, swinging further to the left we see the lean-to and just catch a glimpse of the 'train-flap' which allows stock from Bickerton station to run into the storage sidings.




Another panorama of three shots shows the view from the other top corner of the garden. Here we see the foundations for the lower loop have been cut into the lawn and the turf removed.



Here we see how this area has been landscaped and Peckforton station built into this corner of the loop. The viaduct is in its 'parked' position allowing access to the patio in the centre of the lower loop.



Swinging the camera to the right in the 2004 photo, you can see the recycled window units propped up against the conservatory, ready to be used for the lean-to. In the 2009 photo you can see the recently erected lean-top greenhouse and the extension to the railway which was cut into the hedge on the right.

The 2005 shot shows the lean-to now in place to allow work to start on the raised beds (once the rubble and mixer have been removed). The 2009 shot shows Peckforton station is now well established.



In the 2005 shot, the sandstone cladding has been added to the raised beds in the middle distance and the leylandii hedge comprises litle more than saplings. By 2009, the hedge is well established and the beds are well populated.


In the reverse of the above image, in 2005 the leylandii saplings are clearly in view while the trackbed for the lower line has been laid and cemented into place. By 2009. the apple tree provides shade for the seating and the foliage obscures the track on the left. This shot was taken by thrusting the camera through a gap in the leylandii hedge.


Here we see a general shot across the garden. Bulkeley station is on the immediate left, Peckforton is in the middle distance, Beeston Castle is top left and Bickerton in adjacent to the lean-to.


Following on from the above, Bickerton station is in the background beside the leant-to. In the 2005 shot, the sandstone cladding is being added to the breeze-block retaining walls. By 2009, none of the cladding has fallen off and the vegetation has been become well established.

How I Anglicised an LGB tank wagon

The raw materials
A bog-standard tank wagon (the least well detailed and cheapest) was bought on eBay:

and a kit of bits was bought from Garden Railway Services (GRS)

Shortening the body
Firstly, the wagon was disassembled which involved unscrewing six screws:

One end of the body needed to be shortened to match the other end and leave room for the uprights. This was achieved with a few strokes of a craft knife:

The tank was sprayed with Plasti-kote grey primer (the standard colour for all my goods stock)

Modifying the chassis
I also removed all vestiges of the brake gear using a razor saw (I now wish I had left one brake block in place) as per the Welshpool and Llanfair.

Adding the tank stays
First, the two baulks were trimmed and glued to the ends of the body:

The uprights were then glued together and added to the ends, and the two upper baulks were glued in place.

Holes were drilled in the sides of the chassis and the upper baulks and the wires provided in the kit were superglued in place.
Finally, I decided to snip the heads from four suitably sized bolts, added a nut and superglued these to the ends of upper baulks. I ought to have done the same for the diagonal ties but decided there was insufficient room.

All the added paraphernalia and straps across the top of the tank were then touched up with black acrylics.

A nice little job which can be completed in an afternoon and to my mind is well worth the effort.

Update - 9/3/15

 Since completing this wagon, I have converted another tank wagon (using square section Plastruct and wire - see Progress Report 37) and weathered both wagons.

Tuesday, July 21, 2009

Progress Report 22 - Platform & Goods stock

Peckforton platform
I finally got around to giving Peckforton station a platform. Owing to limited space, I decided to put the platform on the inside of the curve. This meant I could experiment with a different approach to forming a curved platform. This time, I used concrete platform edging formed using a JigStones mould.

I have only one platform edging mould and hence I had to produce the 19 sections over a period of three days (see How I made structures using JigStones [to come]). Fortunately, rapid-set cement takes only 20 minutes or so to set sufficiently well for the sections to be removed from the moulds so the turn-round time is quite quick.

The first job was to prepare the intended location for the edging blocks. These were bedded on a layer of cement, and then the space behind was back-filled with more cement with wooden shuttering to contain the cement on the back edge of the platform.

The platform surface was initially smoothed down with a trowel. However, I then decided to roughen up the surface with a paintbrush using a mix of brushing and stippling.

There are a few anomalies - as I progressed I realised I needed to use the running surface of the rail as a datum when settling the edging blocks in place and I needed to clean out wet cement from the mortar lines on the mouldings.

However, overall I am pleased with this approach to creating curved platforms. It is relatively straightforward and provides a pleasing result.

Goods stock update
Four wagons have been modified to become more appropriate for the railway.

Tank wagon
A standard LGB tank wagon has been modified, using an anglicising kit from Garden Railway Services (see How I Anglicised a tank wagon)

Guard's van 1 The kit-built guard's van (I think it's an IP Engineering model) which I bought on eBay (see Progress Report 19) has been given a repaint and had a few extra details added. Plasti-kote grey primer is used as standard for all goods stock (it's a lighter shade than Halfords) with the underframe and handles picked out in black. Footboards removed from an LGB closed van (see below) were added and LGB couplings have been installed (which seems like a travesty - one day I will pluck up the courage to change over to centre buffers on all my stock).

Guard's van 2
A half completed GRS conversion bought as part of a job-lot from eBay has been finished off. The basis for the conversion is the ubiquitous LGB closed van which includes a balcony at one end. The previous owner had decided to add another balcony and use plastic mouldings from GRS for the duckets. The conversion was missing one end to the cabin. The door-end of another LGB van (see below) was removed and added to fill the gap, a missing ducket from GRS was fixed in place and roof modified to fit. Various gaps were filled and smoothed down and the whole thing was given a coat of Plasti-kote primer (after masking out the underframe and windows). Various features were picked out in black acrylic.


Closed van
The 'donor' LGB van pillaged for parts for the above two conversions was given a new plain end made from plasticard to replace what was the balcony. The curious side windows were filled in with plasticard and filler which was then smoothed down and scribed. The body was then grey Plasti-koted with details picked out in black acrylic.